Case Studies

Thursday, December 10, 2009
Miller Brewing Company (MB), in pursuit of aggressive environmental responsibility goals, continuously strives to reduce both energy consumption and waste generation. At MB’s Irwindale, California, brewery, EPS and MB identified an opportunity to achieve both of the above by building an anaerobic digester, which uses...
Thursday, October 29, 2009
A major health care company wanted to reduce its energy costs and increase the sustainability of its business through the implementation of a high-efficiency solar power system at its facility in the San Francisco Bay Area. High wind and seismic activity in the geographic location...
Thursday, August 6, 2009
Improving energy efficiency and reducing carbon emissions is a high priority for a growing number of companies. Anticipating the impact of future regulations and carbon footprints at the product level adds pressure and an even greater degree of difficulty. Increasingly, industrial and manufacturing companies need...
Thursday, August 6, 2009
A regional operator of temperature-controlled and dry warehouse space wanted to expand one of its facilities, an 85,000 square-foot refrigerated warehouse. The refrigeration system at the facility had been designed with expansion in mind; the compressors were sized to handle additional load. However, the refrigeration...
Wednesday, July 15, 2009
San Diego Gas & Electric wanted to ease their industrial customers’ energy load during peak periods by instituting a Permanent Load Shift program with an efficiency partner....